Job Sequencing Problem
Problem Statement:
You are given two arrays: deadline[], and profit[], which represent a set of jobs, where each job is associated with a deadline, and a profit. Each job takes 1 unit of time to complete, and only one job can be scheduled at a time. You will earn the profit associated with a job only if it is completed by its deadline.
Your task is to find:
- The maximum number of jobs that can be completed within their deadlines.
- The total maximum profit earned by completing those jobs.
-
Example:
Input: deadline[] = [4, 1, 1, 1], profit[] = [20, 10, 40, 30]
Output: [2, 60]
Explanation: Job1 and Job3 can be done with maximum profit of 60 (20+40).
Input: deadline[] = [2, 1, 2, 1, 1], profit[] = [100, 19, 27, 25, 15]
Output: [2, 127]
Explanation: Job1 and Job3 can be done with maximum profit of 127 (100+27).
Input: deadline[] = [3, 1, 2, 2], profit[] = [50, 10, 20, 30]
Output: [3, 100]
Explanation: Job1, Job3 and Job4 can be completed with a maximum profit of 100 (50 + 20 + 30).
✅ Solution: Greedy + Deadline Slotting (Reverse Scheduling)
class Solution {
public:
vector<int> jobSequencing(vector<int> &deadline, vector<int> &profit) {
int n = profit.size();
int max_deadline = *max_element(deadline.begin(), deadline.end());
vector<int> sch(max_deadline + 1, -1); // 1-based scheduling
vector<pair<int, int>> jobs;
for (int i = 0; i < n; i++) {
jobs.push_back({profit[i], deadline[i]});
}
// Sort jobs by profit in descending order
sort(jobs.rbegin(), jobs.rend());
int count = 0, totProfit = 0;
for (int i = 0; i < n; i++) {
int currProfit = jobs[i].first;
int currDeadline = jobs[i].second;
// Try to find a free slot from current deadline backward
while (currDeadline > 0 && sch[currDeadline] != -1) {
currDeadline--;
}
if (currDeadline == 0) continue; // No slot available
sch[currDeadline] = 1; // Schedule job
count++;
totProfit += currProfit;
}
return {count, totProfit};
}
};
📝 How It Works
- You’re given jobs with deadlines and profits.
- Each job takes 1 unit time, and only one job can be done at a time.
- Objective: maximize the number of jobs done and the total profit.
- Sort all jobs by profit in descending order.
- Try placing each job at the latest possible time slot before its deadline.
- If a slot is available, mark it and add profit.
🧩 Key Formula / Greedy Strategy
- Sort jobs by
profitin descending order. - For each job, find the latest available slot ≤ deadline.
- If found, schedule the job and add profit.
⏱️ Time & Space Complexity
| Metric | Value |
|---|---|
| Time | O(N log N + N * D) |
| Space | O(D) |
N: number of jobsD: maximum deadlineN log N: sorting jobs- Worst-case slot search for each job: up to
Dtimes
You can optimize time using DSU (Disjoint Set Union) to O(N log N) with path compression.
⚠️ Edge Cases
- Multiple jobs with the same deadline.
- No job can be scheduled.
- All jobs have deadline > max slots available.
💡 Other Approaches
| Approach | Time | Space | Notes |
|---|---|---|---|
| Brute Force | O(N²) | O(N) | Try every job in every slot |
| DSU/Union-Find | O(N log N) | O(N) | Optimized slot finding with DSU |