Task Scheduler

Problem Statement:

You are given an array of CPU tasks, each labeled with a letter from A to Z, and a number n. Each CPU interval can be idle or allow the completion of one task. Tasks can be completed in any order, but there's a constraint: there has to be a gap of at least n intervals between two tasks with the same label.

Return the minimum number of CPU intervals required to complete all tasks.

  • Example:

    Example 1:

    Input: tasks = ["A","A","A","B","B","B"], n = 2

    Output: 8

    Explanation: A possible sequence is: A -> B -> idle -> A -> B -> idle -> A -> B.

    After completing task A, you must wait two intervals before doing A again. The same applies to task B. In the 3rd interval, neither A nor B can be done, so you idle. By the 4th interval, you can do A again as 2 intervals have passed.

    Example 2:

    Input: tasks = ["A","C","A","B","D","B"], n = 1

    Output: 6

    Explanation: A possible sequence is: A -> B -> C -> D -> A -> B.

    With a cooling interval of 1, you can repeat a task after just one other task.

    Example 3:

    Input: tasks = ["A","A","A", "B","B","B"], n = 3

    Output: 10

    Explanation: A possible sequence is: A -> B -> idle -> idle -> A -> B -> idle -> idle -> A -> B.

    There are only two types of tasks, A and B, which need to be separated by 3 intervals. This leads to idling twice between repetitions of these tasks.

✅ Solution: Task Scheduler Using Max Heap + Greedy

class Solution {
public:
int leastInterval(vector<char>& tasks, int n) {
unordered_map<char, int> freqMap;

// Step 1: Count frequency of each task
for (auto task : tasks) {
freqMap[task]++;
}

// Step 2: Push all frequencies into max heap
priority_queue<int> maxHeap;
for (auto it : freqMap) {
maxHeap.push(it.second);
}

int totalTime = 0;

// Step 3: Process tasks in cycles of size n + 1
while (!maxHeap.empty()) {
int time = 0;
vector<int> temp;

for (int i = 0; i <= n; i++) {
if (!maxHeap.empty()) {
temp.push_back(maxHeap.top() - 1); // Decrement task count
maxHeap.pop();
time++;
}
}

// Step 4: Push back remaining tasks
for (auto count : temp) {
if (count > 0) maxHeap.push(count);
}

totalTime += maxHeap.empty() ? time : n + 1;
}

return totalTime;
}
};


✅ Structured Revision Notes


📝 How It Works

  • Problem: Schedule tasks with cooling period n between two same tasks to minimize total time.
  • Greedy Approach with Max Heap:
    1. Count frequency of each task.
    2. Use max heap to always pick the most frequent task first.
    3. In each cycle of size n + 1:
      • Pick up to n + 1 tasks, process them, decrement their count.
      • If any tasks still have remaining count, push them back.
    4. Add total time including idle slots if needed.
  • Why n + 1 cycle?
    • One task uses a spot, followed by n cooldowns before repeating the same task.

🧩 Key Formula / Recurrence

  • Cycle length = n + 1
  • Total time = Number of full cycles + Remaining tasks.

⏱️ Time & Space Complexity

MetricComplexity
TimeO(N log N)
SpaceO(N)
  • N = number of tasks.
  • Heap operations take log N time per push/pop.

⚠️ Edge Cases

  • n = 0 → No cooldown required. Total time = number of tasks.
  • All tasks same → Maximum idle times.
  • All tasks unique → No idle time even with n > 0.

💡 Other Approaches

ApproachTime Complexity
Sorting + Math FormulaO(N)
Max Heap (this method)O(N log N)
  • Math formula approach available if exact counts are needed in constant time using max frequency.

  • LeetCode 621: Task Scheduler
  • LeetCode 134: Gas Station (Greedy/Simulation pattern)
  • LeetCode 621 + 621 follow-up versions with extra constraints
💬